Last week, the European Space Agency (ESA) announced that two more satellites for Europe’s Galileo
satellite navigation will be launched on 27 March 2015. Galileo satellites 7
and 8 are scheduled to lift off from Europe’s Spaceport in French Guiana on top
of a Soyuz rocket and they are expected to become operational by mid-2015. This
launch, scheduled for late last year, was delayed due to the Soyuz launch anomaly
of Galileo satellites 5 and 6 which took place in August 2014.
News and comments on flights, aviation and space transportation, industry developments, consumer protection and similar issues from a legal perspective and many more…
Showing posts with label Soyuz. Show all posts
Showing posts with label Soyuz. Show all posts
Wednesday, 25 March 2015
Thursday, 8 January 2015
U.S. GAO rejects Sierra Nevada’s protest over NASA $6.8 billion space contracts
On January 5, 2015, the U.S. Government Accountability
Office (GAO), rejected a protest filed by the Sierra Nevada Corporation (SNC)
over a NASA contract award to SpaceX and Boeing, to develop crew transportation
vehicles to the International Space Station (ISS), under the Commercial Crew Transportation
Capability (CCtCap) Program.
Friday, 17 October 2014
AWST reveals selection criteria for CCtCap
The aerospace
magazine Aviation Week and Space
Technology (AWST) reports
that an internal document by William Gerstenmaier, NASA’s Associate
Administrator, sheds light to the selection criteria that NASA used to award to
Boeing and Space Exploration Technologies (SpaceX) contracts on Commercial Crew
Transportation Capability (CCtCap), in order to transport NASA astronauts to
the International Space Station (ISS) as of 2017. The main criteria were the maturity
of concepts proposed and the degree of risk to schedule.
Tuesday, 14 October 2014
Independent Enquiry Board announces causes for failed Galileo Launch
Last week, the Independent Inquiry Board (“the Board”),
entrusted with the task to examine the exact causes that led to the orbital
injection anomaly of Galileo satellites 5 and 6 on August 22, announced its
definite conclusions. The Board reported that the anomaly occurred during the
flight of the launcher’s fourth stage, the Fregat. Its main cause was a deficiency
in the system thermal analysis performed during the design stage.
Subscribe to:
Posts (Atom)